Byk 1018 Levelscreed
Cement Based, Self Leveling
BYK 1018 LEVELSCREED is cement based, self-levelling, applicable between 3 – 10 mm thickness, ready to use under coating levelling screed.
Fields of Application
• Hospitals,
• Stores,
• School and Administration Offices,
• Hotels,
• Apartments,
• Grocery Stores,
• Shopping Malls,
• Leveling of rough and uneven surfaces and removal of the irregularities,
• In the leveling of the screeds with bad surface before bonding of ceramic, marble, natural stone, parquet, carpet and PVC coatings
Advantages
• Can be applied with pomp.
• Provides fast and easy application.
• Economic.
• Mixed only with water.
Technical Features
Structure of the Material |
Mineral fillers and polymer reinforced special cement |
Color |
Gray |
Density |
2,10 ± 0,05 kg/ lt |
Compression Strength 28 days |
15 N/mm² |
Tensile Strength 28 days |
>1 N/mm² |
Flexural Strength |
>3 N/mm² |
Application Surface Temperature |
+5°C / +35°C |
Application Thickness |
3 - 10 mm |
Pot Life |
30 minutes |
Open Traffic Time |
5 hours |
The values above are given for +23°C and 50% relative humidity. While higher temperatures shorten the period, lower temperatures extend it
Application Procedure
Preparation of the Substrate
The concrete sub-surfaces to be applied must have a strong and sufficient compressive strength (minimum 25 N / mm2), tensile strength of at least 1,5 N / mm2, maximum humidity of 4%, floor temperature minimum + 8 °C. Also, the dew point of the floor should be over + 3 °C. The bottom surface must be clean, dry and free of any foreign objects such as dirt, oil, grease, coating and surface curing materials.
Mixing
Pour the amount of water indicated on the package into a clean mixing bowl. Slowly add the BYK 1018 LEVELSCREED into the water and stir for 3 minutes until you get a homogenous mixture with the electric mixer and the appropriate mixing tip. Material should not be allowed to clump at the bottom of the bucket and these pellets should be distributed. After waiting for about 2 minutes, stir for another 1 minute to make it ready for application.
Mixing Rates
For 25 kg/1 bag of BYK 1018 LEVELSCREED approximately 5,00±0,50 lt of water should be used.
Preparation of the Substrate
The concrete sub-surfaces to be applied should be prepared in such a way that it can remove the cement slurry by using abrasive equipment (Shot Blasting, milling, diamond, etc.) to obtain an open-pored surface. Weak concrete parts should be removed from the surface, small gaps, holes should be made completely open. The dust must be cleaned with the help of industrial vacuum cleaner.
Application
Primer
BYK 1018 LEVELSCREED should be primed to increase the adherence of the leveling screed to the floor, reduce the air bubbles to form, and to prevent the liquid from being absorbed by the floor. Surface properties should be examined in the selection of primer and time requirement should be calculated. Depending on the requirement, the selected BYK 1104 PRIMERA primer is mixed with water in
a ratio of 1/1 and applied by brush or roller. Apply the 2nd coat on very absorbent surfaces. BYK 1018 LEVELSCREED application can be started after primer drying.
Coating
BYK 1018 LEVELSCREED is poured on the surface, applied with a suitable trowel or comb. When the coating reaches the appropriate consistency, apply the hedgehog roller and remove the dragged air. If the hedgehog roll application is delayed, traces of the hedgehog
roller may remain on the surface.
Watch Points
• BYK 1018 LEVELSCREED application, if the ambient and surface temperature is below + 5 ° C or above + 35 ° C, the appropriate
temperatures should be waited.
• Do not apply in extremely hot, rainy or windy weather.
• The materials to be used in the area to be applied should be brought and stored 1-2 days in advance and provided to adapt to the environmental conditions.
• It should be ensured that the ambient and ground temperature should be increased with the heaters in the applications to be done in extremely cold weather conditions and it should be conditioned at + 20 ° C - + 25 ° C in the materials to be used and made ready for application.
• The working and reaction times of cement based systems are affected by the ambient and ground temperatures and the relative humidity in the air. At low temperatures, the reaction slows down, extending the lifetime of the pan (container) and the working time. High temperatures accelerate the reaction and the times mentioned above are shortened accordingly.
• In order for the material to cure, the ambient and floor temperatures should not fall below the minimum permissible temperature. After mixing, the material should be rested and then mixed again.
• After the application of BYK 1018 LEVELSCREED, it is necessary to wait at least 3 days for another coating.
Cleaning of Application Tools
Consumption
Package
Shelf Life
12 months from date of manufacture under appropriate storage conditions. Opened packages should be consumed within 1 week by closing their mouths.